04 / Kit

Kit that arrivesbefore the first game.

Match kit, training wear and sponsor-ready teamwear — designed, sized, numbered and delivered against your fixture list, not against a factory's convenience.

Get a quote WhatsApp us

The deadline is the fixture, not the order date

Every club has the same story: the kit turned up two weeks into the season, in the wrong sizes, with a sponsor logo the sponsor did not approve.

We work backwards from your first fixture. Design gets signed off, a sizing run goes out to the squad, sponsors approve their placement in writing, and production is booked to land with time to spare.

Sublimated match shirts, training tees, playing trousers, caps and bags — with numbering and names where you want them.

Custom Top-Knock team cricket kit

Included

What we supply

Full teamwear, or just the pieces you are missing.

01

Match kit

Sublimated shirts and playing trousers in club colours, with numbering and player names.

02

Training wear

Practice tees, shorts and warm-up layers built for training loads rather than match day.

03

Sponsor placement

Logo positioning laid out and approved by your sponsors before anything is printed.

04

Sizing runs

Sample sets sent to the squad so nobody is guessing between a medium and a large.

05

Caps & accessories

Playing caps, sun hats, kit bags and the small things that finish a squad off.

06

Repeat orders

Your design stays on file, so mid-season replacements and new signings are a two-day job.

At a glance

What we supply

Use this to narrow things down before you get in touch. Anything here can be adapted.

What we supply
ItemTypical useCustomisation
Match shirtsPlaying kit in club coloursSublimated, numbers, names, sponsor logos
Playing trousersWhites or coloured, match gradeClub piping, waistband branding
Training teesPractice and warm-upLighter fabric, simpler print
Warm-up layersPre-match and cooler monthsFull club branding
Caps and sun hatsPlaying and touringEmbroidered club mark
Kit bagsSquad and individualName and number, club colours

Production schedule

Counting backwards from your first fixture

This is the timeline we work to. If you come to us later than week ten, we will tell you honestly what is still achievable rather than promise and miss.

  1. Week −10

    Brief and design

    Colours, layout, sponsor positions. First mock-ups back within a few days.

  2. Week −9

    Design sign-off

    You approve, and every sponsor whose logo appears approves in writing. Nothing moves until this is done — this is the step that causes reprints.

  3. Week −8

    Sizing run

    A sample set goes to the squad. Everyone tries on and confirms. No guessing between a medium and a large.

  4. Week −7

    Sizes confirmed and order placed

    Final numbers, names and quantities locked. Production booked.

  5. Weeks −6 to −3

    Production

    Sublimation, cutting, stitching, numbering. We check in at the halfway point.

  6. Week −2

    Quality check and delivery

    Kit arrives, gets checked against the order, and is sorted by player before it reaches you.

  7. Week −1

    Buffer

    Deliberate slack for anything that went wrong. Most seasons we do not need it. The seasons we do, it saves the launch.

Process

From idea to delivery

Five stages, one point of contact throughout.

  1. 01

    Design

    Colours, layout and sponsor placement mocked up until you are happy.

  2. 02

    Approve

    Written sign-off from you and from every sponsor whose logo appears.

  3. 03

    Size

    A sample set goes to the squad. Sizes come back before anything is cut.

  4. 04

    Produce

    Booked against your first fixture, with a buffer built in.

  5. 05

    Deliver

    To one address, sorted by player, with the numbers already on.

Questions

Before you ask

The things people want to know before they get in touch.

What is the minimum order?

Practical minimums start around a full squad — roughly fifteen sets. Below that the per-unit cost climbs steeply and we will tell you so rather than take the order quietly.

How long does production take?

Plan on four to six weeks from final approval to delivery. We will always ask for your first fixture date and work backwards from it.

Can you match our existing club colours?

Yes. Send a shirt or the hex codes from your brand guide and we will match to it.

What if we get new players mid-season?

Your design stays on file. Single-unit repeat orders turn around far faster than the original run.

Need kit for the coming season?

Tell us your first fixture date and squad size. We will work the timeline backwards from there.

Send an enquiry Call +971 50 632 8350

Also from Top-Knock

Other things we run

Most clients start with one service and end up using three.